Reservoirs & Recovery

Enhanced Oil Recovery (EOR): from evaluation to start-up

We support the full EOR project cycle —polymer, chemical (SP/ASP), gas or thermal methods—: screening, laboratory, pilot, plant and location engineering, start-up and field-wide expansion.

Ask about this service →

Methods

  • Polymer flooding
  • Surfactant-polymer (SP) and ASP
  • Low salinity water
  • Gas injection and WAG
  • Thermal methods for heavy oil
  • Gels and in-depth conformance

EOR project cycle

  1. ScreeningSelection of the method and candidate reservoirs by fluid, rock, temperature and salinity.
  2. StudiesLaboratory program, reservoir simulation and incremental oil forecast.
  3. PilotPilot design, area selection, monitoring plan and success criteria.
  4. Plants and locationsConceptual and basic engineering of the injection plant, water preparation, chemical storage and adaptation of locations and lines.
  5. Start-upCommissioning, procedures, operator training and injection quality control.
  6. Evaluation and expansionResponse interpretation, project economics and field scale-up plan.

Evaluation of ongoing projects

01

Technical audit

Independent review of design, operations and reservoir response.

02

Project economics

Cost per incremental barrel, chemical consumption and price sensitivity.

03

Improvement plan

Adjustments to concentration, rates, patterns and water quality.

Deliverables

  • Screening study and method selection
  • Pilot design and monitoring plan
  • Plant and surface facility specifications
  • Start-up and operating procedures
  • Technical and economic evaluation report

What we watch closely

  • Water quality and compatibility
  • Chemical degradation and adsorption
  • Back-produced chemicals and their effect on treatment
  • Injector well integrity
  • Safe chemical handling