Reservoirs & Recovery

Waterflooding: design, management and optimization

From reservoir evaluation to daily injection operations: we design, revitalize and optimize secondary recovery projects to recover more oil per barrel of water.

Ask about this service →

Services

01

Evaluation and screening

  • Reservoir suitability for injection
  • Pilots and their interpretation
  • Incremental recovery forecast
02

Project design

  • Patterns, spacing and rates
  • Water quality and compatibility
  • Injection and treatment facilities
03

Pattern surveillance

  • Injection-production balance
  • Hall plots, capacitance resistance models (CRM) and tracers
  • Detection of channeling and injectivity loss
04

Optimization and revitalization

  • Rate reallocation and selective injection
  • Conformance in injectors and producers
  • Infill wells and well conversions

How we work

  1. DataProduction and injection history, pressures, tests and well status.
  2. Pattern diagnosisSweep efficiency, balances and inter-well connectivity.
  3. OpportunitiesInjection adjustments, conformance, workovers and new wells.
  4. PlanActions ranked by incremental oil and cost.
  5. Follow-upPattern indicators and periodic reviews with your team.

Deliverables

  • Project diagnosis by pattern
  • Optimization plan with estimated incremental oil
  • Surveillance program and indicators
  • Training for the reservoir and production team

Related services

  • Enhanced oil recovery (EOR)
  • Water shut-off and conformance
  • Mature field improvement

Would you like to discuss your case?

A senior consultant in the discipline will reply within 48 business hours to arrange a first meeting.

Ask about this service →
WhatsApp