In-house course Drilling and Completion

Frac Pack and High Rate Water Pack

For your team · date and location to be agreed

  • 16 hours
  • On site or online
  • For your team

About the course

Advanced sand control techniques that combine stimulation and packing in poorly consolidated sandstone reservoirs. It develops the criteria for choosing between gravel pack, frac pack and high rate water pack, treatment design with tip screen-out and supervising the operation with service tools. Participants will analyze real treatment charts and diagnose failures.

Objectives

Design and execute frac pack and high rate water pack treatments.

Who should attend

Completion engineers in unconsolidated sand reservoirs.

Course base program

Reference program: before delivery we adjust content, depth and duration with your team.

  1. Module 1

    Selection

    When to use each technique.

    • Frac pack versus gravel pack
    • Reservoir criteria
    • Service tools
  2. Module 2

    Design

    Tip screen-out and packing.

    • Calibration test (minifrac)
    • Tip screen-out design
    • Gravel and screen selection
  3. Module 3

    Execution

    Operation and evaluation.

    • Operational sequence
    • Real-time pressure analysis
    • Skin and performance evaluation

How an in-house course works

  1. Needs reviewWe talk with your technical team and HR about objectives, profiles and the level of the group.
  2. Program adjustmentWe adapt modules, exercises and duration to your operation, using your company data and cases if you wish.
  3. DeliveryAt your facilities or live online, on the dates you choose, for your team only.
  4. Close-outParticipant assessment, certificates and a final report for your company.

Looking for an open date to enroll individually? See the open course calendar →

WhatsApp